How many revision rounds should a website project include?
Unlimited revisions sound generous in a proposal and turn painful by week six. A clear number of rounds protects your time and, just as much, helps clients give better feedback. Here is how to pick the number, define what a round is, and write it down so it holds.
Why a number helps both sides
Without a limit, feedback arrives one thought at a time. A client spots something on Monday, emails it, then notices something else on Wednesday. Each small message restarts your work, and the project drifts. With a limit, clients know each round counts, so they look properly, gather the team's views and send everything together.
A limit also protects the client. It keeps the project on budget and on schedule, and it makes them part of finishing it.
Picking the number
Two or three rounds per stage is a common starting point. A typical pattern:
- Round 1 is for direction: layout, structure, tone and anything else that changes the shape of the page.
- Round 2 refines wording, images, spacing, colours and the phone layout.
- Round 3 is a final check with small fixes and sign-off. If it brings big changes, something was missed earlier.
Adjust for the project. A one-page site for a sole trader may need two rounds. A 40-page site with a marketing team, a founder and a legal reviewer may need more, or a rule that each stakeholder group reviews in a set order.
Setting rounds for each stage
Revisions work best tied to stages, so approved work stays approved:
| Stage | What's reviewed | Typical rounds |
|---|---|---|
| Sitemap and content plan | Pages, structure, what goes where | 1 to 2 |
| Design | Look and layout of key pages | 2 to 3 |
| Build | The real site on staging, on every screen size | 2 |
| Pre-launch | Final content, forms, links | 1 |
Once a stage is signed off, changing it later is new work. That one rule prevents most "can we go back to the old homepage" moments.
Define what a round is
The number means little unless everyone agrees what a round is. A definition that works:
- The client gathers feedback from everyone on their team and sends it together.
- The feedback sits in one place, ideally as comments on the page itself.
- It arrives within an agreed window, for example five working days from when you share the stage.
- You work through all of it, reply to each point and share the next version.
Pinned comments make this much easier to hold. When every note sits on the exact element it is about, you can see the whole round at once, reply to each point and resolve it, and the client can see what was done.
What doesn't count as a revision
- Fixing something that doesn't match the approved design, or doesn't work. That is yours to fix.
- Dropping in final copy or photos the client sends later.
- Answering questions about why something was designed a certain way.
Wording for your proposal
Something like this, adjusted to your process:
- "Each stage includes two rounds of revisions. A round is all feedback from your team, collected on the review link within five working days."
- "Once a stage is approved, changes to it are quoted as additional work."
- "Additional revision rounds are charged at a fixed price per round, agreed before work starts."
- "Fixes for errors on our side are always included and don't count as a round."
When they want one more round
It will happen. Keep it friendly and factual: remind them what was included, say what the extra round costs, and offer to roll small items into the next stage instead. If you priced extra rounds in the proposal, this is a two-line email rather than a negotiation.
Most extra rounds come from feedback that was vague the first time. Our guide to vague client feedback helps turn "make it pop" into a change you can make in one round, and our feedback request email templates set the expectations at the start of each round.
Questions
How many revisions are normal for website design?
Two or three rounds for each stage of the project is a common starting point, for example at the design stage and again at the build stage. Larger projects with more stakeholders sometimes include more. Pick a number that fits your price and timeline, and say it clearly.
What counts as one revision round?
All of the client's feedback on a stage, sent together in one place, which you then address in one go. Feedback that trickles in over a week across email and chat should still count as one round, which is why a single shared place for comments matters.
What happens when the client wants more rounds?
Point to the proposal and offer extra rounds at an agreed price, or roll small fixes into the next stage. Agreeing the price of an extra round before the project starts makes this conversation easy.
Should I offer unlimited revisions?
Usually not. Unlimited revisions tend to lead to scattered, low-effort feedback and projects that never finish. A clear limit encourages clients to gather their thoughts and send everything at once.
Is a bug fix a revision?
No. Fixing something that doesn't match the approved design, or doesn't work, is part of your job. Revisions are changes to what was agreed. Write that difference into the proposal.
Collect each round in one place. Send a review link where clients click the page to comment, then resolve everything before the next round.